group.sr.Zum Inhalt group.sr.Zum Inhaltsverzeichnis group.sr.Zur Hautpnavigation
Brückner Group SE
Menü
Home
  • Technologien
  • Nachhaltigkeit
    Zurück Nachhaltigkeit
    • Ökologie
    • Ökonomie
    • Soziales
    • Initiative "Yes, we care"
  • Über uns
    Zurück Über uns
    • Geschäftsführung
    • Mitarbeiter
    • Geschichte & Höhepunkte
  • Auf einen Blick
  • Management Holding
  • Technologieführerschaft
  • Partnerschaften
  • Digitalisierung
  • Compliance
  • News-Room
  • Downloads
  • Karriere
  • Brückner-Gruppe weltweit
Brückner Group SE
Königsberger Str. 5-7
83313 Siegsdorf
Deutschland
+49 8662 63-0
brueckner.group@brueckner.com
  • Mitglieder der Brückner-Gruppe
    Schließen
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Weitere Informationen
    Brückner Servtec GmbH
    SERVING
    YOUR
    SUCCESS
    Weitere Informationen
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Weitere Informationen
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Weitere Informationen
  • Karriere
  • DE
    English 中文
  • Schließen

    Suche

    Wonach suchen Sie?

Table Of Content
    Brückner Group: Aktuelle Nachrichten
    1. Brückner Group
    2. News-Room
    3. Great electrical support during service emergency
    Folge uns:

    Great electrical support during service emergency

    16 Apr 2019

    Improved line availability with integrated process control (IPC) upgrade

    Garware Polyester Ltd., one of the largest manufacturer of polyester films in India, teamed up with Brückner Servtec to maximize the availability of their line no. 5 in Aurangabad with a comprehensive software and automation hardware upgrade. The BOPET line, which has been installed by Brückner in 1996, will be equipped with a brand new IPC system to make it ready for the future and increase its availability. The implementation on-site will start in the middle of 2019.

    With Brückner’s IPC, Garware will have one single system for the control and visualization of the entire film production line. The system is specifically developed to the needs of the film production industry and makes the line’s operation, maintenance and support much easier:

    Within the IPC-upgrade, Brückner installs a new Programmable Logic Controller (PLC) S7 and the latest process visualization software WinCC-OA Server. For the new PLC, Brückner will check all signal inputs and outputs (I/O), which is a complete electrical maintenance and service of the whole line. Additionally, each line component will receive new operator stations for the revolutionary 8-Mode-Operation. It enables a faster and repeatable start-up of production by using pre-defined operation states such as “purging”, “threading in MDO or TDO” or “production”. Furthermore, the IPC modification replaces obsolete hardware, which ensures the future availability, reliability and support of server, workstations and PLC. The line’s system will have latest technology and the spare parts supply will be secured for the future.

    The risk of obsolete hardware

    The consequences of obsolete hardware showed up also during a service emergency support at the line recently. The customer reported that several workstations at the pull roll did not work no longer, and they could not operate the line, since the visualization failed. Immediately, Brückner service experts tried to log into the system remotely, however it did not work because the server did not communicate anymore. With the help of Brückner’s knowledge and experience, it became apparent after several tests that an old Motorola PC failed. Unfortunately, a new spare Motorola PC was not available anymore in the market.

    However, Garware still had a spare PC available, that Brückner installed in 1996 during the initial commissioning of the line. The customer installed the spare PC and the Brückner team supported the team on-site during the installation and new start of the BOPET line. Finally, all workstations run again and the Brückner Servtec experts could save the old IPC system and supported the customer with a temporary solution, until the new IPC system will be implemented.

    Garware’s General Manager of the Electrical Department was very happy: “We thank Brückner Servtec for the quick support. It was a challenging situation for both sides to make the obsolete server working again. Thanks to the Brückner specialists’ hard work and expertise, we could restart the production. We will have more peace of mind again, when Brückner implements the new IPC system in June and our line will be equipped with state-of-the-art technology with secured spare parts supply.”

    ALTTEXT

    Weitere Nachrichten

    Das könnte Sie auch interessieren

    06 Jun 2025

    Yangzhou Boheng and Brückner successfully start a new line | 扬州博恒与布鲁克纳成功投产新生产线

    An important impetus for China’s entire current collector film industry | 中国集流体薄膜产业的重要推动力
    Mehr lesen
    28 Mai 2025

    First hybrid BOPP/PE line successfully commissioned in the Southeast Asian markets

    PT. Indopoly Swakarsa and Brückner are celebrating the unlocked potential for BOPE packaging solutions in this region
    Mehr lesen
    13 Mai 2025

    Hubei Firsta and Brückner Servtec cooperate for major inline coating upgrade

    Agreement officially signed at Chinaplas 2025
    Mehr lesen
    06 Mai 2025

    Manucor transitions to state-of-the-art twin screw extrusion

    Significantly lower energy consumption and maximized film quality as key benefits 
    Mehr lesen
    10 Apr 2025

    A clear commitment to film production in Europe

    Plastchim-T/Manucor orders a new Brückner BOPP film line
    Mehr lesen
    10 Apr 2025

    Inteplast Group relies on NDC thickness gauge technology

    Brückner Servtec supplies advanced thickness measurement solutions 
    Mehr lesen
    24 Mär 2025

    Two new high-efficiency BOPP lines for GulfPack

    Setting the benchmark in the GCC area and beyond
    Mehr lesen
    19 Mär 2025

    Value added labels and packaging films? Brückner’s LISIM® is the technology of choice

    Unique simultaneous stretching line for Innovia
    Mehr lesen
    18 Mär 2025

    Kiefel-Mitarbeiter Sven Engelmann mit dem renommierten President’s Cup der SPE ausgezeichnet

    Auszeichnung für über 20 Jahre Engagement, inklusive Führungsrollen und Förderung transatlantischer Kooperation in der Thermoforming-Branche. Verleihung auf der SPE ANTEC® 2025 in Philadelphia
    Mehr lesen
    11 Mär 2025

    Changzhou Zhongheng successfully upgrades to TDO e-heating register

    Reduced CO2 emissions and less maintenance as key benefits
    Mehr lesen
    Mehr über die Mitglieder der Brückner-Gruppe
    Members of Brückner Group
    • Brückner Maschinenbau
    • Brückner Servtec
    • Kiefel
    • PackSys Global
    Weltweit
    • Brückner-Gruppe auf einen Blick
    • Brückner-Gruppe weltweit
    • Karriere
    Quick Links
    • Über uns
    • Management-Holding
    • Technologien
    • Compliance
    • Karriere Holding
    Find us here
    Brückner Group SE
    • Impressum
    • Datenschutzhinweis
    • DSGVO-Informationen
    • Haftungsausschluss
    © Copyright 2025 Brückner Group SE