Highlights

Highlights

  • 2017: 10th worldwide line relocation conducted with Brückner Servtec’s expertise
  • 2016: Newly established supplier cooperation "Service Alliance"
  • 2015: 5-Layer Upgrade with Ultra High Barrier capability and multi-purpose extrusion
  • 2014: 20-year-old line speed up by 40% with special upgrades
  • 2014: First 5-layer BOPP upgrade carried out in China
  • 2013: Fifth 5-layer upgrade for one of the largest manufacturers of BOPP film in the world
  • 2013: Celebration of 10th jubilee: the company has nearly doubled the number of employees
  • 2012: For the first time: non-Brückner line upgraded to 5-layer
  • 2011: For the first time: non-Brückner line upgraded with new chain track system
  • 2010: New generation of TRAVIS remote service tools
  • 2010: Foundation of Brueckner Colombia S.A.S.
  • 2010: Worldwide first line conversion from BOPP to BOPLA film production
  • 2007: First upgrade to 7-layer film production with high barrier EVOH capability
  • 2007: Foundation of Brueckner Machinery and Service India
  • 2003: Speed upgrade: the world‘s fastest BOPP line with 525 m/min
  • 2003: Foundation of Brückner Servtec